Need assistance? Call our expert team today

Gold

Case Studies

Ash Grove Academy

They required a contractor who could work diligently and who they could trust to deliver whilst keeping to the specification set out by the management team.

Gainsborough Primary School

The proposed works comprise a single storey extension formed in load-bearing masonry under an existing overhang roof canopy supported by a corner column.

FJ Need Ltd

These works consisted of striping out the farmhouse. Treating floors as well as roof beams for woodworm. Alterations to several doorways. The installation of 3 new loft access hatches.

Holes Lane Medical Centre

The Works comprise of the construction of a new double storey surgery extension, remodelling of the existing surgery and external works.